top of page

Milestone

Explore My Work

p1_edited.jpg
Milestone: Welcome

Milestone 0

Before starting the project, the team established administrative roles. This ensures that every member of the team has a set of responsibilities and expectations.

Milestone 1

The team put together a pre-project research paper about our topic of focus; Wind Energy. We also introduce the problem statement of the project.

Milestone 2

An objective tree was created to list all the objectives of the wind turbine and turbine blade. Here, we determine our primary and secondary objective as well as a decision matrix

Milestone: Files

Milestone 3A

In this part of the project, the team created a material performance index for each objective to determine how well the object was met by various materials

Milestone 3B

Here, we perform design embodiment; we created a CAD model of the turbine blade. We also experimented with a deflection simulation which helps us determine how much the blade would deflect under pressure

Milestone 4

The last milestone was to finalize the design of the blade, including determining the thickness of the blade that would yield the ideal deflection of 10mm

Milestone: Files
  • Facebook
  • Twitter
  • LinkedIn

©2020 by Dania's portfolio. Proudly created with Wix.com

bottom of page